Spec 2*10886 was created in transaction CG02BD and then a copy template was used to pull data into certain VATs. I've asked the developer to tell me what spec was used as a copy from as well as the copy template and I'm awaiting a reply. Our date format is MM/DD/YYYY so 06/09/2014 is June 9th, 2014. I can tell you that the only reason the change number is associated with this record is because the spec was assigned to the material using that change number via the material master.
↧